A capital renovation project has been developed for the heating, water supply, and sewage systems of a student dormitory in Kyiv.
As usual, we’re working with tight deadlines, incomplete baseline data, a minimal budget — and high hopes for success (like many in Ukraine today)
Design of a major overhaul of the heating system in one of the administrative buildings of Lvivelectrotrans Municipal Enterprise, followed by author’s supervision during implementation.
3D scanning of the client's premises was performed to support the subsequent design of the building reconstruction.
The project included the new construction of a solid fuel boiler house at an industrial facility in Kyiv.
Design and author’s supervision services were provided. The project involved the reconstruction of the heating system at a preschool facility, including the installation of new solid fuel boilers and the construction of a separate backup branch of the heat distribution network.